{"id":322,"date":"2010-08-20T13:36:13","date_gmt":"2010-08-20T05:36:13","guid":{"rendered":"https:\/\/bamboobikes.com.au\/?p=322"},"modified":"2010-08-20T13:36:13","modified_gmt":"2010-08-20T05:36:13","slug":"carbon-fibre-wet-layup-stage-2","status":"publish","type":"post","link":"https:\/\/bamboobikes.com.au\/2010\/08\/20\/carbon-fibre-wet-layup-stage-2\/","title":{"rendered":"Carbon fibre wet layup – stage 2"},"content":{"rendered":"

Unwrapping the first layer this morning and it’s all gone well. The cling wrap’s left lots of wrinkles in the resin, which isn’t ideal, but for these base layers it’s ok as it’ll all get sanded back. Hopefully by the time I’m on my final layer’s I’ll be shrink-wrapping with better precision.<\/p>\n

I’m now onto the 2nd and 3rd layers. Each layer I’m making from a slightly smaller template so the edges of the carbon fibre will gradually taper off rather than being a sharp drop off to where the bamboo is.<\/p>\n